>

Tuesday, April 24, 2007

patio project phase 2 98% complete


phase2 posing
Originally uploaded by bothenook.
here's the 8 1/2 foot bbq deck. i'm sweeping in the fine grit setting sand to lock the pavers into place.
next, level all the dirt around the two decks, build a cover for the large deck, and pour cement walkways.
but that's all for phase 3.


for a look at the phase two flickr photoset, follow this link

Labels: , , , ,

0 Comments:

Post a Comment

<< Home